top of page
III GENERAZIONE

C-F2

OPTIMIZER OF ENERGY

C-F2 is the only energy stabilizer and optimizer on the market, capable of increasing the efficiency of electrical equipment with the consequent decrease in faults of the same and greater general performance of the systems. The C-F2 technology has the ability to stabilize the voltage, current and frequency, making them perfectly aligned and available at the moment of the real request by one or more users and increasing their performance up to 100% of the possible efficiency.

C-F2: Prodotti

Installations

C-F2

In evidence

C-F2: Portfolio

Why choose C-F2 technology  

Your needs first of all

Improvement of energy quality

Respect for European objectives for the protection of the planet

Incentives and tax breaks

Remote control

Economic saving

C-F2: Servizi
Incentives and Discounts

The C-F2 electricity optimizer is an innovative technology that can benefit from various incentives introduced by the budget law 2021 in an industry 4.0 key and included in Annex A annexed to Law 232/2016 (so-called Budget Law 2017 and extension by Budget Law 2021).

According to the type of customer:

Company

  • Tax credit of 50% for material goods related to industry 4.0 ANNEX A law 11 December 2016, n. 232. Budget Law 2021 Transformation Plan 4.0 MSE

Private

  • paragraph 58 of the 2021 budget law, extending to 31 December 2021 the measure of the deduction to 50 percent, up to a maximum expense of 96,000 euros, for building renovations indicated in article 16-bis, paragraph 1, of the TUIR the "energy saving"

The C-F2 electricity optimizer is an innovative technology that can benefit from various incentives introduced by the budget law 2021 in an industry 4.0 key and included in Annex A annexed to Law 232/2016 (so-called Budget Law 2017 and extension by Budget Law 2021).

According to the type of customer:

Company

  • Tax credit of 50% for material goods related to industry 4.0 ANNEX A law 11 December 2016, n. 232. Budget Law 2021 Transformation Plan 4.0 MSE

Private

  • paragraph 58 of the 2021 budget law, extending to 31 December 2021 the measure of the deduction to 50 percent, up to a maximum expense of 96,000 euros, for building renovations indicated in article 16-bis, paragraph 1, of the TUIR the "energy saving"

Monete
In-depth knowledge of the market

A fundamental product for those companies that want to obtain an important energy efficiency to be more competitive on the market, reducing consumption.

Our potential customers are: pharmaceutical industries; building materials industries; plastic and / or resin processing companies; beverage producers; integrated water systems; glassworks; cold logistics; paper mills; GDO and large distribution; marble and ceramic processing companies; hotel industry.

Stretta di mano
To protect the general plant engineering

Our energy optimizer and stabilizer is an intelligent tool that inserted upstream of all loads, can filter interference, equalize voltage and current by increasing efficiency, correct the power factor by zeroing the phase shift, and last but not least It is important to protect your equipment from the failures that network interference will inevitably cause over time.

 

With the C-F2 we can extend the life of the equipment and drastically reduce failures that result in plant shutdowns and downtime with consequent assistance and maintenance costs. We can also reduce consumption, optimize and make the electrical system more efficient, eliminate breakdowns and assistance.

elettricista
Thorough technical evaluation

The C-F2 has been designed to take electrical energy from any source, stabilize it, eliminating harmonics, rephasing it and consuming an amount of energy in instantaneous kw reduced from 7 to 25% compared to that in kw taken, keeping almost unchanged kw taken from the meter and transferred to electrical equipment (users).


The C-F2 is inserted between the meter and the electrical panel of the user's distribution system, without actually changing anything.

Our technicians will carry out a preventive analysis through an inspection to verify the actual technical-economic feasibility in compliance with the actual needs of the user.

Dati
C-F2: Funzionalità
bottom of page